Belize Marine Conservation and Climate Adaptation Initiative

<img width="640" height="481" src="https://www.adaptation-fund.org/wp-content/uploads/2014/08/Belize_coral-reef3.jpg" class="attachment-post-thumbnail size-post-thumbnail wp-post-image" alt="" decoding="async" loading="lazy" srcset="https://www.adaptation-fund.org/wp-content/uploads/2014/08/Belize_coral-reef3.jpg 640w, https://www.adaptation-fund.org/wp-content/uploads/2014/08/Belize_coral-reef3-300x225.jpg 300w" sizes="auto, (max-width: 640px) 100vw, 640px" />

The coastal zones of Belize are critical to its economy, as the livelihoods of fishers, other resource extactors, and the tourism sector, relies upon these ecosystems. It will also be a zone affected by climate-induced increased storm surges. This project’s objective is to implement priority ecosystem-based marine conservation and climate adaptation measures to strengthen the climate resilience of the Belize Barrier Reef System. The project will take a two-pronged approach – both enhancing ecosystem function and therefore resilience through recovery and restoration, and reducing degradation caused by overexploitation and pollution. Specifically, the project will support (i) the improvement of the reef’s protection regime including an expansion and enforcement of the Marine Protected Areas (MPAs) and replenishment (no-take) zones in strategically selected locations to climate resilience, (ii) promotion of sustainable alternative livelihoods for affected users of the reef, and (iii) building local capacity and raising awareness regarding the overall health of the reef ecosystem and the climate resilience of coral reefs.

Click here for project approval document.

Related Links

 

Project Component 1: Improving the protection regime of marine and coastal ecosystems USD 2,000,000
Project Component 2: Support for viable and sustainable alternative livelihoods for affected users of the reef USD 2,450,000
Project Component 3: Raising awareness, building local capacity, and disseminating information USD 560,000
Project execution cost USD 520,000
Total Project Cost USD 5,530,000
Implementing Entity Project Cycle Management Fee USD 470,000
Grant Amount USD 6,000,000

 

At A Glance

Country/Region:

Belize/Latin America & Caribbean

Grant Amount:

USD 6,000,000

Transferred Amount:

USD 6,000,000

Implementing Entity:

International Bank of Reconstruction and Development

Executing Entity:

Protected Areas Conservation Trust

Approval Date:

08/18/2014

Start Date:

03/17/2015

Completion Date:

01/03/2022

Expected Completion Date:

03/17/2020

Revised Completion Date:

09/30/2020

Duration:

5 years

Status:

Project Completed

Project ID:

BLZ/MIE/Coastal/2011/1

Locations: